Pre-launch · enrolling pilot halls

309.4 KKelvalis

Cool the hall you actually have.

AI racks draw 100 kW and more, and most halls are still cooled by fixed setpoints and static dashboards. Kelvalis builds a live physics-ML twin of your hall, sees the hotspot before it forms and tunes cooling for less energy, with your operators approving every change.

Thermyx twin · hall 2Example
Example data hall, top view: four rows of twelve racks coloured by predicted inlet temperatureCOLD AISLEHOT AISLECOLD AISLEL1R1L2R2L3R3L4R4ABCDHALL 2 · 1.8 MW IT · 44 RACKS

<2121–2323–2525–2727–29≥29outlined = above 27 °C

Control

Scenario

PUE
1.42
Hottest inlet
27.1 °C
Racks above 27 °C
2
Cooling power
1,180 kW

Fixed setpoints. Mid-row GPU racks run hot while the wall ends are overcooled.

Example hall. Temperatures come from a toy model and PUE values are illustrative, not measurements. The 27 °C line follows the commonly used ASHRAE recommended inlet range.

307.4 KTargets

What we are building toward.

Design targets for the first pilot halls, not results. We will publish measured numbers per hall, with the method, as pilots finish.

15–30 %

less cooling energy in a typical air-cooled hall

Design target

Minutes

of warning before an inlet crosses 27 °C

Design target

0

control changes that skip the safety envelope

Design target

More racks

placed in the same hall, with the thermal proof

Design target

305.4 KProblem

AI made heat the constraint.

The rack got ten times hotter. The tools that cool it did not change.

  • AI racks now draw 100 kW and more, and many need liquid cooling. Air-era rules of thumb no longer hold.
  • Cooling is often the largest energy cost after the IT load itself, and fixed setpoints overcool most of the hall to protect a few racks.
  • DCIM shows what already happened. It cannot say where air goes or which rack overheats next.
  • Without a thermal model, operators leave capacity stranded rather than risk a hotspot.

301.3 KHow it works

From your trends to a live twin.

  1. 01Week 1

    Connect

    Read-only links to BMS, DCIM, meters and the floor plan, inside your network.

  2. 02Weeks 2–4

    Build the twin

    Thermyx learns how air and heat move in your hall from geometry and history.

  3. 03Weeks 4–8

    Shadow

    The twin predicts inlet temperatures beside your live readings. You see the error every day.

  4. 04Weeks 8–12

    Advise

    Cryon proposes setpoints with the predicted effect. Your operators decide.

  5. 05After review

    Expand

    Placement, liquid loops and grid signals, then the next hall.

299.3 KWho it’s for

For the people who keep the hall cold.

297.3 KControl safety

Your BMS stays in charge.

Kelvalis never touches a setpoint your operators have not approved, and it never overrides a BMS safety.

  • Every proposal shows the twin’s predicted inlet temperatures first.
  • A hard envelope on temperature, humidity, pressure and redundancy that no policy can widen.
  • Every change logged with who approved it, and one-click rollback.
  • The control loop runs on-site, on hardware you own, isolated from the internet.
How control safety works
  1. L1Advisory

    Cryon proposes setpoints with the twin’s prediction. People apply them. Where every site starts.

  2. L2Supervised

    Cryon applies changes inside a tight envelope after an operator approves each batch. Rollback is one click.

  3. L3Bounded autonomy

    Cryon acts on its own inside the envelope and reports every change. Planned; only after months of supervised evidence, and per site.

295.2 KStack

Built on the NVIDIA accelerated stack.

  • Modulusphysics-ML airflow and thermal surrogates
  • CUDAfast thermal solves and RL rollouts
  • Omniversethe 3D hall twin and what-if views
  • RAPIDStelemetry cleaning and features
  • cuOptrack placement and schedules
  • NeMo + Guardrailsthe ops copilot that explains and proposes
  • Jetsonon-site control loop, isolated from the internet
  • Triton, NIM, TensorRTserving models and policies

The libraries and platforms we build on. Real-time thermal models and RL control need GPUs; at facility scale they do not fit on CPUs. No NVIDIA partnership or endorsement is implied.

293.2 KQuestions

Straight answers.

Is Kelvalis available today?

No. Kelvalis is pre-launch. We are enrolling a small number of pilot halls to build and validate the first twins with us.

Do you replace our DCIM or BMS?

No. Kelvalis reads from them and, only for approved Cryon setpoints, writes back through them. Their alarms and safeties stay in charge.

Do we need new sensors?

Usually not to start. The twin begins with the rack-inlet, return-air and power data most halls already collect, and tells you where one more sensor would help most.

What does a pilot touch?

Nothing, at first. The pilot is read-only until your team chooses to try advisory setpoints.

Are the numbers on this site real?

No. They are design targets or illustrations, and each is labelled. Measured numbers will come from pilot halls.

291.2 KNext step

Give us one hall. We will show you where the heat goes.

Send a floor plan, a month of BMS and DCIM trends and the rules your cooling runs on today. We build a Thermyx twin of that hall, replay the month and show you the hotspots it would have predicted and the cooling energy it would have saved. Advisory only: nothing touches your controls.