309.4 KIntegrations

It reads what your hall already says.

Kelvalis connects through the protocols your BMS and DCIM already speak. No rip and replace, no new control system.

305.8 KEcosystem

What it connects to.

Controls

BMS

Building controls over BACnet, Modbus and OPC UA.

Inventory

DCIM

Asset, space and power data through exports and APIs.

Telemetry

Sensors

Rack inlet, return and humidity sensors, wired or wireless.

Liquid

CDUs

Liquid cooling units and loop instrumentation.

Power

Power

PDUs, busways and meters over SNMP and Redfish.

Geometry

Floor plans

CAD and BIM exports, IFC, OpenUSD.

Outside

Grid and weather

Tariffs, carbon intensity and forecasts.

Workflow

Tickets

Webhooks and ITSM for proposals and alerts.

302.1 KData

Sources and formats.

Supported data sources (draft; confirm per site)
SourceProtocols and formatsDirection
BMS and building controlsBACnet/IP, Modbus TCP, OPC UARead; write only for approved Cryon setpoints
DCIM and powerREST exports, SNMP, Redfish, CSVRead
Sensors and metersMQTT, BACnet, vendor gatewaysRead
CDUs and liquid loopsModbus TCP, OPC UA, vendor APIsRead; write planned with Fluxio
Floor plans and CADIFC, DWG or DXF exports, OpenUSDRead once, then on change
Grid and weatherUtility price feeds, carbon intensity APIs, weather forecastsRead
Reports and ticketsCSV, PDF, webhook, ITSM integrationsWrite

298.5 KAPI

The twin, as an API.

Read the live twin state and run what-ifs from your own tools.

  • Per-rack inlet forecasts.
  • Scenario runs on demand.
  • Placement studies.
  • Action log export.
forecast.pyExample
# read 15-minute inlet forecasts for one row
from kelvalis import Twin

twin = Twin(site="dc-east", hall="hall-2")
for rack in twin.forecast(row="B", minutes=15):
    if rack.inlet_c > 26.5:
        print(rack.id, rack.inlet_c, rack.cause)
# B-07 26.8 recirculation from hot aisle

294.8 KInstall

How the connector goes in.

  1. 01Day 1

    Network

    A read-only connector on a server or VM in your OT network.

  2. 02Week 1

    Map

    Every point mapped and named, with your team.

  3. 03Week 1

    Validate

    Gaps and bad sensors reported.

  4. 04Week 2

    Stream

    Telemetry flows to the twin.

291.2 KNext step

Give us one hall. We will show you where the heat goes.

Send a floor plan, a month of BMS and DCIM trends and the rules your cooling runs on today. We build a Thermyx twin of that hall, replay the month and show you the hotspots it would have predicted and the cooling energy it would have saved. Advisory only: nothing touches your controls.