309.4 KHow it works
Read-only first. Trust earned in weeks, not promised.
Every Kelvalis deployment follows the same path. Each step has a clear exit, and nothing touches your controls until your team decides it should.
306.4 KSteps
Five steps, about three months.
01Week 1
Connect
Read-only links to BMS, DCIM, meters and sensors. The floor plan and the rules your cooling runs on.
02Weeks 2–4
Build the twin
Geometry plus history: Thermyx learns how air and heat move in the hall.
03Weeks 4–8
Shadow
Predictions beside live readings. A daily error report per rack.
04Weeks 8–12
Advise
Cryon proposes setpoints with predicted effect and envelope check. Operators apply them.
05After review
Expand
Supervised control, Rackon studies, Fluxio loops, Voltiq schedules, more halls.
303.3 KWho does what
Clear lines.
| Step | Your team | Kelvalis |
|---|---|---|
| Connect | Approves read-only access and shares the floor plan. | Installs the connector, maps every point. |
| Build the twin | Answers questions about the hall: tiles, blanking, containment. | Builds and calibrates the twin. |
| Shadow | Reviews the daily accuracy report. | Tunes the model until error meets the agreed target. |
| Advise | Decides which proposals to apply. | Proposes, explains, logs. |
| Expand | Chooses what comes next. | Scopes it and repeats the same gates. |
300.3 KConfiguration
The envelope is written down, not implied.
Your limits live in one file your engineers own. Cryon reads it; it cannot change it.
- Inlet temperature and humidity limits per row.
- Redundancy: which units must stay available.
- Rate limits on every setpoint.
- Which points Cryon may ever write to.
# owned by facilities engineering; Cryon reads, never writes
hall: hall-2
mode: advisory # advisory | supervised
inlet_c: { min: 18.0, max: 27.0 }
dew_point_c: { max: 15.0 }
redundancy: N+1
writable:
- crah/*/supply_air_setpoint
- crah/*/fan_speed
rate_limits:
supply_air_setpoint: 0.5 C per 10 min
fan_speed: 5 % per 5 min
rollback: on_any_inlet_above 26.5297.3 KOutcomes
What you have at the end.
Model
A calibrated twin
A model of your hall you can question, with its measured error.
Energy
An energy baseline
Where cooling energy goes today and what the twin says is safe to save.
Decision
A decision
Evidence to decide whether advisory control is worth continuing. Your call.
294.2 KQuestions
Straight answers.
How much of our team's time does this take?
About two hours a week from one facilities engineer, more in week 1.
What if the twin is wrong?
You will see it in the daily accuracy report. If it does not meet the agreed target, we do not move to advice.
Can we stop at any point?
Yes. Each step ends with a review, and stopping leaves your systems exactly as they were.
291.2 KNext step
Give us one hall. We will show you where the heat goes.
Send a floor plan, a month of BMS and DCIM trends and the rules your cooling runs on today. We build a Thermyx twin of that hall, replay the month and show you the hotspots it would have predicted and the cooling energy it would have saved. Advisory only: nothing touches your controls.