Thermyx

309.4 KThe twin · Twin

Thermyx: the physics-ML digital twin of your facility.

A model of how air and heat move through your hall, kept honest by your own sensors. It predicts every rack’s inlet temperature minutes ahead and lets you test a change before you make it.

Hall 2Racks modelled44
Hall 2Horizon15 min
Hall 2Mean error0.31 °C
Hall 2Refresh60 s

Example values.

307.1 KCapabilities

What it does.

01

Physics-ML thermal model

Reduced-order airflow and heat transfer with learned corrections, fast enough to run every minute on GPUs.

02

Continuous calibration

Compares predictions with BMS and sensor readings and corrects itself; shows its own error.

03

Hotspot forecasts

Per-rack inlet temperature forecasts and anomaly flags before a limit is crossed.

04

What-if scenarios

Heatwaves, unit failures, new racks, missing blanking panels: run them on the twin, not the hall.

05

3D hall view

An Omniverse view of the hall with temperatures, airflow and the active scenario.

06

Twin API

The live twin state that Cryon, Rackon, Fluxio and Voltiq read from.

304.8 KAccuracy

It shows its own error.

The twin is only useful if you can see how wrong it is. Every hall gets a daily accuracy report per rack.

Calibration check · rack B-07 · 24 hExample
Twin prediction and measured inlet temperature for rack B-07 over one day 20 °C22 °C24 °C26 °C00:0006:0012:0018:0024:00

Measured inlet, rack B-07Thermyx prediction, 15 min aheadMean error 0.19 °C

302.6 KScenarios

Test it on the twin, not the hall.

  • SC-01Heatwave: outdoor wet-bulb +4 °C for 3 daysweatherHours each rack spends above 27 °C, chiller margin12 min
  • SC-02Humid shoulder seasonweatherEconomizer hours lost, dew-point margin9 min
  • SC-03CRAH trips in the far cornerfailureTime to first rack above 27 °C, which racks4 min
  • SC-04Chiller 2 offline for maintenancefailureLoad on the remaining plant, inlet risk by row7 min
  • SC-05Blanking panels missing in row CfailureRecirculation and the racks it reaches3 min
  • SC-06Add 20 GPU racks at 80 kWgrowthWhere they fit, what moves, what it costs in cooling18 min
  • SC-07Retire a legacy storage rowgrowthCapacity recovered, airflow to re-tune6 min
  • SC-08Move a cluster to direct-to-chipliquidAir load removed, CDU and loop limits15 min

Example scenario library. Run times are design targets for a 2 MW hall on one GPU node.

300.3 KHow it works

One cycle, start to finish.

  1. 01Each minute

    Ingest

    Telemetry and the floor plan arrive and are aligned.

  2. 02Seconds

    Predict

    The twin runs forward 15 minutes.

  3. 03Each minute

    Compare

    Predictions meet readings; error is recorded.

  4. 04Hourly

    Correct

    Learned terms update when error drifts.

  5. 05Each minute

    Publish

    The twin state goes to the other products.

298.0 KSpecification

The details.

Thermyx specification (draft)
ItemDetail
InputsRack inlet and return temperatures, CRAH and CDU states, power per rack or PDU, floor plan
ModelReduced-order physics plus ML surrogates (Modulus); full CFD fidelity is a later goal
OutputsPer-rack inlet forecasts, airflow paths, anomaly flags, scenario results
RefreshEvery 60 seconds (design target)
Accuracy targetMean absolute error below 0.5 °C on rack inlets, reported daily
ComputeNVIDIA GPU server on-site or in your cloud; Omniverse for the 3D view
StatusIn development; pilot halls first

295.8 KIn the loop

Where it sits.

Thermyxlive twin state

Realized temperatures and energy flow back and recalibrate the twin

Thermyx is the hub. Every other product reads its live state, and realized temperatures and energy flow back to recalibrate it.

293.5 KQuestions

Straight answers.

Is this full CFD?

Not at first. Thermyx starts with reduced-order physics and learned corrections, which are fast enough for live use. Full-fidelity CFD is a stated later goal.

How long does a twin take to build?

Our target is two to four weeks for one hall with a usable floor plan and a month of history.

What if our sensor coverage is thin?

The twin tells you where it is least certain and where one more sensor would help most.

291.2 KNext step

Give us one hall. We will show you where the heat goes.

Send a floor plan, a month of BMS and DCIM trends and the rules your cooling runs on today. We build a Thermyx twin of that hall, replay the month and show you the hotspots it would have predicted and the cooling energy it would have saved. Advisory only: nothing touches your controls.