309.4 KControl safety

Uptime first. Savings second. Always in that order.

A cooling optimizer that causes one outage has failed, however much energy it saved. Kelvalis is built so that it cannot surprise you.

RuleBMS safetiesalways on
RuleDefault modeadvisory
RuleEnvelopeowned by you
RuleRollbackone click

Design principles, not certifications.

306.8 KPrinciples

Five rules we do not bend.

01

The BMS stays in charge

Cryon writes setpoints through your BMS. Alarms, interlocks and safeties stay active.

02

Advisory by default

Nothing is applied without a person. Supervised mode is opt-in, per hall.

03

A hard envelope

Limits your engineers write and Cryon cannot change.

04

Predicted before applied

Every proposal is simulated on the twin first.

05

Measured after applied

If a reading moves faster than predicted, the change rolls back.

06

Everything logged

Every prediction, proposal, approval and rollback, exportable.

304.2 KLevels

Three levels of control.

  1. L1Advisory

    Cryon proposes setpoints with the twin’s prediction. People apply them. Where every site starts.

  2. L2Supervised

    Cryon applies changes inside a tight envelope after an operator approves each batch. Rollback is one click.

  3. L3Bounded autonomy

    Cryon acts on its own inside the envelope and reports every change. Planned; only after months of supervised evidence, and per site.

301.6 KMethod

What happens to one proposal.

  1. 01Seconds

    Propose

    The policy suggests a change.

  2. 02Seconds

    Simulate

    The twin predicts every rack’s inlet.

  3. 03Instant

    Check

    Envelope, rate limits and redundancy.

  4. 04Your pace

    Approve

    A named operator applies it.

  5. 0530 min

    Watch

    Measured vs predicted, with automatic rollback.

299.0 KStandards

Context, not claims.

Standards context (draft)
ReferenceHow Kelvalis relates
ASHRAE thermal guidelines for data processing environmentsDefault inlet envelope follows the recommended range; your engineers set the final limits
ISO/IEC 30134 (data-center KPIs, including PUE)Voltiq reports follow the published definitions
EN 50600 / ISO/IEC 22237Context for availability classes and redundancy rules in the envelope
IEC 62443 (industrial control security)Design reference for the edge control loop; assessment planned
SOC 2 Type IIPlanned for the Kelvalis cloud

Kelvalis is not certified against these standards. They are design references. Planned assessments are marked as planned.

296.4 KAudit

Every action, on the record.

action A-121.jsonExample
{
  "id": "A-121",
  "hall": "hall-2",
  "proposal": "chilled_water_setpoint 7.0 -> 9.0 C",
  "twin_prediction": { "max_inlet_c": 25.4, "dew_point_c_at_14h": 14.6 },
  "envelope_check": "HELD: dew point within 0.4 C of limit",
  "operator": null,
  "applied": false,
  "logged_at": "2026-11-12T13:02:11Z"
}

293.8 KQuestions

Straight answers.

Who is liable if something goes wrong?

Your team approves every change, your BMS safeties stay active and we write responsibilities into each pilot agreement.

Can Cryon write to anything we did not list?

No. Writable points are an explicit list in the envelope file.

What happens if the Kelvalis edge node fails?

Your BMS carries on with its own setpoints. Kelvalis is never in the critical path.

291.2 KNext step

Give us one hall. We will show you where the heat goes.

Send a floor plan, a month of BMS and DCIM trends and the rules your cooling runs on today. We build a Thermyx twin of that hall, replay the month and show you the hotspots it would have predicted and the cooling energy it would have saved. Advisory only: nothing touches your controls.