309.4 KControl safety
Uptime first. Savings second. Always in that order.
A cooling optimizer that causes one outage has failed, however much energy it saved. Kelvalis is built so that it cannot surprise you.
Design principles, not certifications.
306.8 KPrinciples
Five rules we do not bend.
01
The BMS stays in charge
Cryon writes setpoints through your BMS. Alarms, interlocks and safeties stay active.
02
Advisory by default
Nothing is applied without a person. Supervised mode is opt-in, per hall.
03
A hard envelope
Limits your engineers write and Cryon cannot change.
04
Predicted before applied
Every proposal is simulated on the twin first.
05
Measured after applied
If a reading moves faster than predicted, the change rolls back.
06
Everything logged
Every prediction, proposal, approval and rollback, exportable.
304.2 KLevels
Three levels of control.
- L1Advisory
Cryon proposes setpoints with the twin’s prediction. People apply them. Where every site starts.
- L2Supervised
Cryon applies changes inside a tight envelope after an operator approves each batch. Rollback is one click.
- L3Bounded autonomy
Cryon acts on its own inside the envelope and reports every change. Planned; only after months of supervised evidence, and per site.
301.6 KMethod
What happens to one proposal.
01Seconds
Propose
The policy suggests a change.
02Seconds
Simulate
The twin predicts every rack’s inlet.
03Instant
Check
Envelope, rate limits and redundancy.
04Your pace
Approve
A named operator applies it.
0530 min
Watch
Measured vs predicted, with automatic rollback.
299.0 KStandards
Context, not claims.
| Reference | How Kelvalis relates |
|---|---|
| ASHRAE thermal guidelines for data processing environments | Default inlet envelope follows the recommended range; your engineers set the final limits |
| ISO/IEC 30134 (data-center KPIs, including PUE) | Voltiq reports follow the published definitions |
| EN 50600 / ISO/IEC 22237 | Context for availability classes and redundancy rules in the envelope |
| IEC 62443 (industrial control security) | Design reference for the edge control loop; assessment planned |
| SOC 2 Type II | Planned for the Kelvalis cloud |
Kelvalis is not certified against these standards. They are design references. Planned assessments are marked as planned.
296.4 KAudit
Every action, on the record.
{
"id": "A-121",
"hall": "hall-2",
"proposal": "chilled_water_setpoint 7.0 -> 9.0 C",
"twin_prediction": { "max_inlet_c": 25.4, "dew_point_c_at_14h": 14.6 },
"envelope_check": "HELD: dew point within 0.4 C of limit",
"operator": null,
"applied": false,
"logged_at": "2026-11-12T13:02:11Z"
}293.8 KQuestions
Straight answers.
Who is liable if something goes wrong?
Your team approves every change, your BMS safeties stay active and we write responsibilities into each pilot agreement.
Can Cryon write to anything we did not list?
No. Writable points are an explicit list in the envelope file.
What happens if the Kelvalis edge node fails?
Your BMS carries on with its own setpoints. Kelvalis is never in the critical path.
291.2 KNext step
Give us one hall. We will show you where the heat goes.
Send a floor plan, a month of BMS and DCIM trends and the rules your cooling runs on today. We build a Thermyx twin of that hall, replay the month and show you the hotspots it would have predicted and the cooling energy it would have saved. Advisory only: nothing touches your controls.