309.4 KPilot halls
Build the first twins with us.
We are enrolling a small number of halls to build, calibrate and validate Kelvalis with. Read-only to start; your team decides every next step.
305.8 KBenefits
What pilot halls get.
Model
A calibrated twin
Of one hall, with its measured accuracy.
Energy
An energy baseline
Where cooling energy goes and what is safe to save.
Influence
A say in the product
Weekly time with the engineers building it.
302.1 KPlan
Twelve weeks.
| Weeks | What happens | What it touches |
|---|---|---|
| 1 | Kick-off, read-only connector, point mapping | Read-only network access |
| 2–4 | Twin build and first calibration | Nothing |
| 4–8 | Shadow mode, daily accuracy reports | Nothing |
| 8–12 | Advisory proposals, your team applies or declines | Only what your team applies |
| 12 | Review: results, decision on next steps | Nothing |
298.5 KFit
A good pilot hall has.
- At least 500 kW of IT load, air or liquid cooled.
- Rack inlet temperature sensors on most rows, or a plan to add them.
- A BMS with BACnet, Modbus or OPC UA access.
- A floor plan, even an old one.
- A facilities engineer with about two hours a week.
294.8 KApply
Enroll a pilot hall.
We read every application and reply within a week.
- No commitment until both sides sign pilot terms.
- Your data stays yours.
- Read-only until you decide otherwise.
291.2 KQuestions
Straight answers.
How many pilot halls?
A small number, so each gets real engineering time.
What does it cost?
Pilot terms are agreed per hall.
Can we pilot in a hall we are building?
Design-phase twins are later. Today we need a hall with live load.