309.4 KPilot halls

Build the first twins with us.

We are enrolling a small number of halls to build, calibrate and validate Kelvalis with. Read-only to start; your team decides every next step.

305.8 KBenefits

What pilot halls get.

Model

A calibrated twin

Of one hall, with its measured accuracy.

Energy

An energy baseline

Where cooling energy goes and what is safe to save.

Influence

A say in the product

Weekly time with the engineers building it.

302.1 KPlan

Twelve weeks.

Pilot plan (draft)
WeeksWhat happensWhat it touches
1Kick-off, read-only connector, point mappingRead-only network access
2–4Twin build and first calibrationNothing
4–8Shadow mode, daily accuracy reportsNothing
8–12Advisory proposals, your team applies or declinesOnly what your team applies
12Review: results, decision on next stepsNothing

298.5 KFit

A good pilot hall has.

  • At least 500 kW of IT load, air or liquid cooled.
  • Rack inlet temperature sensors on most rows, or a plan to add them.
  • A BMS with BACnet, Modbus or OPC UA access.
  • A floor plan, even an old one.
  • A facilities engineer with about two hours a week.

294.8 KApply

Enroll a pilot hall.

Use your company email.

For example 2 MW.

We read every application and reply within a week.

  • No commitment until both sides sign pilot terms.
  • Your data stays yours.
  • Read-only until you decide otherwise.

291.2 KQuestions

Straight answers.

How many pilot halls?

A small number, so each gets real engineering time.

What does it cost?

Pilot terms are agreed per hall.

Can we pilot in a hall we are building?

Design-phase twins are later. Today we need a hall with live load.