Rackon

309.4 KCapacity · Place

Rackon: thermal-aware capacity and rack placement.

“Can this hall take 20 more GPU racks, and where?” Rackon answers with a simulation on the twin instead of a spreadsheet and a rule of thumb.

StudyRacks to place8 × 60 kW
StudyOptions tested1,284
StudyBest rowD
StudyHottest inlet25.9 °C

Example study.

306.8 KCapabilities

What it does.

01

Placement studies

Thousands of placements simulated on the twin and ranked by thermal headroom.

02

Capacity map

Usable kW per row and per rack position, not nameplate.

03

Densification plans

What moves, what changes in cooling and in what order.

04

Stranded capacity

Where power exists but cooling headroom does not, and what would unlock it.

05

Workload moves

The thermal effect of moving a cluster between halls.

06

Design studies

New builds and retrofits, planned on a twin before construction. Later.

304.2 KPlacement study

Where do eight 60 kW racks fit?

Rackon · placement study · hall 2Example

Place eight 60 kW racks in

Row A40 kWRow B210 kWRow C180 kWRow D260 kW
Hottest inlet after placement
28.4 °C
Verdict
Too hot

Row A sits next to L1, which already runs at 91 % load. Four racks would pass 27 °C at peak.

Row A310 kWRow B-60 kWRow C120 kWRow D260 kW
Hottest inlet after placement
30.2 °C
Verdict
Too hot

Row B shares the hot aisle with C. Its far end loses R2 margin first; this choice fails the N+1 check.

Row A310 kWRow B140 kWRow C30 kWRow D260 kW
Hottest inlet after placement
27.6 °C
Verdict
Marginal

Fits on power, but two racks touch 27 °C when outdoor wet-bulb is high.

Row A310 kWRow B210 kWRow C150 kWRow D70 kW
Hottest inlet after placement
25.9 °C
Verdict
Fits

Row D has the coldest supply and the shortest path to R3 and R4. All inlets stay below 26 °C, N+1 kept.

Bars show the cooling headroom left in each row after placement. Example values from the example hall, not a real facility.

301.6 KHow it works

One cycle, start to finish.

  1. 01Minutes

    Ask

    Racks, power and constraints.

  2. 02Seconds

    Generate

    Candidate placements.

  3. 03Minutes

    Simulate

    Each one on the twin, in parallel on GPUs.

  4. 04Seconds

    Rank

    By headroom, redundancy and cost to move.

  5. 05Your pace

    Decide

    Your team picks; the plan goes to your change process.

299.0 KSpecification

The details.

Rackon specification (draft)
ItemDetail
InputsRack power and dimensions, power paths, redundancy rules, the Thermyx twin
MethodCombinatorial search (cuOpt) over twin simulations (Modulus, CUDA)
OutputsRanked placements, capacity map, densification plan, report
ConstraintsInlet limits, N+1 cooling, power per PDU and busway, weight and space
StatusIn development

296.4 KIn the loop

Where it sits.

Thermyxlive twin state

Realized temperatures and energy flow back and recalibrate the twin

Rackon plans against the same twin Cryon controls, so a placement is checked against the cooling that will actually run.

293.8 KQuestions

Straight answers.

Does Rackon handle power, not just cooling?

It checks power paths and redundancy as constraints. Thermal headroom is what it is built to find.

Can it plan a new building?

Design-phase planning is on the roadmap. Today the focus is existing halls.

Who signs off a placement?

Your capacity and facilities teams. Rackon gives evidence, not orders.

291.2 KNext step

Give us one hall. We will show you where the heat goes.

Send a floor plan, a month of BMS and DCIM trends and the rules your cooling runs on today. We build a Thermyx twin of that hall, replay the month and show you the hotspots it would have predicted and the cooling energy it would have saved. Advisory only: nothing touches your controls.